Funded Projects
1 | Modernization of Clinical Instrumentation lab | AICTE, New Delhi | 10.00 lakhs | 2009-10 |
2 | Design and development of wearable photoplethysmographic biomedical sensor for physically handicapped and in the Diagnosis of Cardio Pulmonary Disease | AICTE, New Delhi | 5.02 lakhs | 2010-13 |
3 | Morphometric Analysis of Knee Joint Diseases for Diagnosis and treatment | AICTE, New Delhi (RPS) | 8.80 lakhs | 2011-14 |
4 | “Socio Economic Development Of Through Vermicomposting And Beekeeping In Davangere District” | Department of Biotechnology, Govt. of India | 13.20 lakhs | 2009-12 |
5 | Exploration of Bacteriophages as an alternative to Antibiotics to target the Emerging Multi drug resistant Bacteria | VGST, Dept. of IT, BT and S & T, Govt. of Karnataka, Bengaluru, | 5.00 lakhs | 2012-13 |
6 | Fermentative Production Of Microbial Cellulose” | Department of Science and Technology, Govt. of India | 22.40 lakhs | 2012-15 |
7 | Atmospheric Microbial Diversity With Particular Reference To Allergic Pulmonary Infections In Davangere. | Department of Science and Technology, Govt. of India | 21.20 lakhs | 2012-15 |
8 | Modernization Of Genetic Engg And Immunotechnology Lab | AICTE, New Delhi | 15.74 lakhs | 2013-14 |
9 | Production Of Bacterial Cellulose | AICTE, New Delhi (RPS) | 12.65 lakhs | 2013-16 |
10 | Airborne Bio contaminants And Their Association With Asthma, Respiratory Infections And Genetic Pre-Disposition | Department of Biotechnology, Govt. of India | 26.50 lakhs | 2014-17 |
11 | Phages as Natural Nano-Medicines to Target Superbugs (2014-15) | VGST, Dept. of IT, BT and S & T, Govt. of Karnataka, Bengaluru (CISEE) | 30.00 lakhs | 2014-17 |
12 | Diversified bacterial and fungal aerosols prevailing branchovascular infections | VGST, Dept. of IT, BT and S & T, Govt. of Karnataka, Bengaluru (SMYSR) | 4.00 lakhs | 2019-21 |
14 | Isolation of low-cost isolation chambers for Covid 19 patients | VTU-TEQIP | 0.50 | 2020 |
15 | Techno performance evaluation of biomethanation of kitchen wastes, AICTE, RPS project | AICTE, New Delhi (RPS) | 9.00 lakhs | 2012-2015 |
16 | Pharmacological screening of traditional medicines Ref. No. VGST/P-8/CISE/2011-12/1147 Dated 22-12-2011 | VGST, Dept. of IT, BT and S & T, Govt. of Karnataka, Bengaluru | 30.00 lakhs | 2012-15 |
17 | Modernisation of process simulation lab R.No.8024/RIFD/MOD-40 (pvt)/Policy-111/2011-12 | AICTE, New Delhi | 12.00 lakhs | 2011-12 |
18 | Investigations on evaluation of Calliandria callothyrsus for production of Bio Ethanol VTU/ACA/2009-10/A-9/11707 Dated 06-01-2010 | VTU | 5.10 lakhs | 2009-12 |
19 | Modernization and Removal of Obsolesce in Atmospheric Science & Engineering | AICTE, New Delhi | 15.00 lakhs | 2012-13 |
20 | Design and Analysis of Efficient Privacy Preserving Data Mining Algorithms | AICTE NEW Delhi (RPS) | 4.30 lakhs | 2013-14 |
21 | Novel Approach to formulate zone parameters to improve the crop yield using remote sensing the data for precision agriculture' | VGST, Dept. of IT, BT and S & T, Govt. of Karnataka, Bengaluru | 40.00 lakhs | 2014-17 |
22 | Depression Detection System and Remedial recommendation System using Machine Learning | New Age Incubation Network (NAIN) Project Funding Scheme | 3 Lakhs | 2020-2021 |
23 | Traffic signal preemption for emergency vehicles | New Age Incubation Network (NAIN) Project Funding Scheme | 3 Lakhs | 2020-2021 |
24 | Smart Ward - Tracking and Alerting System | New Age Incubation Network (NAIN) Project Funding Scheme | 3 Lakhs | 2018-2019 |
24 | Smart No parking detector with IoT | New Age Incubation Network (NAIN) Project Funding Scheme | 3 Lakhs | 2018-2019 |
22 | Modernization of Power Systems Simulation Laboratory | AICTE, New Delhi | 18.3 lakhs | 2013-14 |
34 | Modernization of Power Systems Simulation Laboratory | AICTE, New Delhi (Under MODROBS) | 18.3 Lakh | 2013 |
35 | Study of Flashover Voltage of Artificially Polluted Porcelain Insulators Energized with High Voltage AC / DC | AICTE, New Delhi (Under RPS) | 7 Lakh | 2003 |
36 | Modernization of High Voltage Engineering Laboratory | AICTE, New Delhi (Under MODROBS) | 7 Lakh | 1997 |
23 | 1. Compression moulding m/c to to produce fiber reinforced composites. 2.Universal Tensile Testing M/c to test mechanical properties composites. | AICTE , New Delhi (RPS) | 8.0 lakhs | 2009-11 |
24 | Modernisation of Rapier weaving loom m/c | AICTE, New Delhi | 4.0 lakhs | 2009-10 |
25 | Analytical and Experimental Investigations of Thermal Errors of a High Frequency Internal Grinding Machine | AICTE, New Delhi | 7.5 lakhs | 2008-11 |
26 | Development of Fully Computerized “Fabro - Feel”, an Instrument to Measure the Handle of a Fabric | AICTE, New Delhi | 7.5 lakhs | 2009-12 |
27 | Modernization of CIM Lab | AICTE, New Delhi | 14.00 lakhs | 2012 |
28 | Development of Advanced Fabrication and Study of Tribological Properties for Metal Matrix Composite | AICTE, New Delhi | 18.3 lakhs | 2012-15 |
29 | Development of a High Frequency Milling Spindle and Evaluation of Dynamic Stability Using Audio-Signal Measurements | AICTE, New Delhi | 13.8 lakhs | 2012-15 |
30 | Development of Piezoelectric Direct Injection for Compression Ignition Engine Working on Bio Diesel Produced from Waste Pupae -- a Byproduct of Silk Reeling Industry | AICTE, New Delhi | 15.75 lakhs | 2013-16 |
31 | The Study of Thermal conductivity of thermal energy storage using different PCMs and to improve efficacy of solar thermal systems and wind energy systems. | VGST, Govt. of Karnataka | 20.00 lakhs | 2016-19 |
1 | Optimization of Biomethanation process for High TDS spent wash form Distilleries | DST-women Scientist India | 19,40000.00. | 2012 |
2 | Optimization of Cellulosic Ethanol Production From Feed Stocks. | VTU-VGST | 39,10000.00 | 2008-12 |
3 | An experimental investigation on removal of dyes and COD from Textile waste water using functionalised lingo cellulosic materials. | KSCST | 5000 | 2015 |
32 | Optimization of cellulosic ethanol production from Feed stocks | VTU | 20.00 lakhs | 2008-11 |
33 | Optimization of Biomethanatioin process for high TDS spent wash from Distilleries | DST | 9.21 lakhs | 2012-15 |